Property |

|
|
General Requirements
|
1. |
Pictures of the damaged property/ies |
|
2. |
Inventory list of
insured property/ies damaged with corresponding
valuation of repair or replacement, liens and
encumbrances, if any, and estimated value of salvage |
|
3. |
A brief written report
as to the events that led to the loss, including the
name of witness/es if available, location/nature of
ownership of the property/ies insured and the year
the building was constructed as well as the original
construction cost (for building loss) |
|
4. |
Arson Investigation
Report or Fire Certification (for Fire losses) |
|
5. |
PAG-ASA Report (for
lightning, typhoon, and other weather disturbance
losses) |
 |
|
Documentary Requirements
For Building Claim
|
1. |
A Civil Engineer’s or
Architects detailed estimate (obtained at the
expense of the Assured) to place the building in the
same state of repair as before the accident |
|
2. |
Proper allowance for age and depreciation |
|
3. |
Others, that may be
allowed |
|
4. |
Appraisal Report, if any |
|
5. |
Copy of the building
plan, complete with dimensions and design
specifications |
|
6. |
Lease Contract or
Agreement, if Assured is not the lot owner |
|
7. |
Certified True Copy of
Building Permit, Transfer Certificate of Title and
Declaration of Real Property |
|
8. |
Original or Copy of the
Policy |
|
9. |
Item Nos. 1 – 5 of the General Requirements |
 |
|
For Goods and
Merchandise Claims
|
1. |
Detailed inventory of
articles damaged, showing the cost price of each,
extent of damage and salvage value, if any, if the
risk sustained partial or water damage |
|
2. |
Proof of damage
(technical report/ laboratory analysis) |
|
3. |
Inventory of the whole
goods and merchandise in the building (for partial
loss) |
|
4. |
Latest inventory report,
for total loss, filed with BIR or any government
entity, prior to the loss |
|
5. |
Movement reports/documents in between the last inventory
report submitted and the date of loss (for total
loss) |
|
6. |
Production and movement
report, for loss in manufacturing area |
|
7. |
Certified True Copies of
Income Tax Return together with the financial
statement for the last 3 years |
|
8. |
Books of Accounts,
Purchases and Sales Invoices and all other business
records |
|
9. |
Location of the other
store or warehouse and amount of insurance on stocks
contained therein, if any |
|
10. |
Original or copy of the
policy |
|
11. |
Item Nos. 1 – 5 of the
General Requirements |
 |
|
For Machinery and
Equipment/ F.F.F. Claims
|
1. |
Detailed inventory of
articles damaged or destroyed, showing the cost
price of each and the date acquired |
|
2. |
Records, invoices,
receipts, if any |
|
3. |
Building contents
lay-out |
|
4. |
Original or copy of the
policy |
|
5. |
Item Nos.1-5 of the
General Requirements |
 |
|
For Spontaneous
Combustion Claim
|
1. |
Insured’s report on the
circumstances of the loss |
|
2. |
Laboratory analysis of
burnt product for adjustment of volume |
|
3. |
Weigh scale/ticket card
indicating the volume of the burnt product |
|
4. |
Daily
Inventory/Production records prior to incident |
|
5. |
Shipping/ Delivery
Records |
|
6. |
Photographs of the burnt
product |
|
7. |
Original or copy of the
policy |
 |
|
For Construction/
Erection All Risks Claim
|
1. |
Insured’s report on the
circumstances of the loss |
|
2. |
Drawing plans and design
specifications |
|
3. |
Building permit (for
building losses) |
|
4. |
Detailed repair estimate
or replacement proposal |
|
5. |
List of bid items and
quantities and any additional offers made stating
dimensions and standard prices |
|
6. |
Inspection reports, if
possible |
|
7. |
Original and/or revised
PERT/CPM |
|
8. |
Records of
interrogations of parties concerned |
|
9. |
Expert’s reports on soil
and ground conditions, etc. |
|
10. |
Reports written by the
police |
|
11. |
Newspaper clippings on
the incident, if any |
|
12. |
Original or copy of the
policy |
 |
|
For IAR/Machinery
Breakdown Claim
|
1. |
Original or copy of the
policy including warranties and clauses attached to
it |
|
2. |
Insured’s report on the
circumstances of the loss |
|
3. |
Pictures of the damaged
property/ies |
|
4. |
Technical/Engineering
Report and Analysis |
|
5. |
Detailed repair estimates |
|
6. |
Quotations, catalogs
from manufacturers/suppliers |
|
7. |
Copy of Contract
Order/Agreement between insured and the contractor |
|
8.
|
Other documents that may be required by the adjuster |
 |
|
For Electronic
Equipment/Business Computer Claim
|
1. |
Original or copy of the policy |
|
2. |
Duly accomplished
information in the Notice of Loss or Damage for
Electronic Equipment Insurance |
|
3. |
Police Investigation
Report |
|
4. |
Incident Report |
|
5. |
Photographs of the
damaged equipment |
|
6. |
Detailed repair
estimates |
|
7. |
Technical Report/
Analysis |
|
8. |
Records, Invoices,
Receipts, if any |
|
9. |
Detailed inventory of
article/s damaged or destroyed showing each cost
price and the date acquired |
|
10. |
Other documents that may
be required by the adjuster |
 |
|
For Business
Interruption/Loss of Profit Claim
|
1. |
Non-manufacturing |
|
|
a. |
Profit and loss
statement for fiscal year immediately preceding
to the loss |
|
|
b. |
Monthly sales report
(at least 2 years prior to the loss) |
|
|
c. |
Application for
Business Interruption Insurance if any has been
filed with the insurance company |
|
2. |
Manufacturing |
|
|
|
a. |
Annual financial statement for 2 fiscal years ended prior to the loss |
|
|
|
i |
Income Statement |
|
|
|
ii |
Balance Sheet |
|
|
d. |
Monthly/ Quarterly |
|
|
|
i |
Operating
Statement |
|
|
|
ii |
Inventories |
|
|
|
iii |
Production schedules |
|
|
|
iv |
Daily/Hourly production in units or in sales value |
|
|
|
v |
Gross Earnings
Value |
 |
 |
 |
|
|
|